The buried-pipe laying of steel natural gas line concerns entire urban gas supply system and the safety of people's lives and properties. 钢质天然气管道埋地敷设工程关系到整个城市供气系统和人民生命财产的安全。
Apply the character of laser in marking and cutting to realize the technological step of laser laying out and cutting to make the mold box of the molded line of the ship hull during the construction of the vessels. 用激光打标和激光切割方法,实现对船舶建造中船体型线样板箱制作材料的划线与下料的工艺步骤。
Research conclusions: The method of manually laying continuously welded rail, conducted in short operational interval, is an effective way for guaranteeing the traffic safety and construction safety in electrification innovation of existing line. 研究结论:在既有线电气化改造施工中,使用这种人工铺轨代替轨排换铺,是一种利用短暂的运营间歇时间,保证运营安全与施工安全的有效方法。
It provides a new method for laying of 10 kV overhead line in the city proper, railway station 、 forest area and industrial area where have narrower ground surfaces and more space obstacles. 为地面狭窄、空间阻隔的城市、铁路站场和林区、工业区等地,提供了10kV线路架设的一种实用新方法。
Here is a brief on seamless track laying, welding in site, stress dispersion in P1 Marked Section of new Line# 2 of Lan-Wu Railway. 简要介绍兰武增建二线P1标段无缝线路的长轨铺设、现场焊接应力放散等施工方法。
A study on laying of jointless line for urban elevated light rail transit 城市高架轻轨交通无缝线路铺设技术研究
In the sewer main pipe and canal design, problems like control of laying depth, avoidance of layout in area of sea reclamation or riverside along and cut down the distance of pressurized line were taken into consideration. 主干管渠设计中注意了控制埋深,避开填海区,缩短压力管,污水截流管离开沿河岸区,管道与河道相交的做法以及运用顶管施工技术等。
Integral shifting and laying of scissors crossing ONLINE The Finish Line 论交叉渡线的整体移铺
On the Route Laying Mode of UMT Line Net 城市轨道交通线网线路敷设方式研究
Laying of Pipe Line for Reclamation Project at the Outer harbour of Macao 澳门外港新客运码头吹填工程水下沉管敷设及有关问题的探讨
According to the laying and using experience of the turnouts on the existing line in Wuhan Railway Bureau, we propose laying methods and quality control requirements of the passenger dedicated turnout. 结合武汉铁路局在既有线上的铺设和使用,提出了客专道岔铺设的方法和质量控制要求。
And our country with a vast territory, laying area of railway line and operation situation is different, laying CWR on the bridge will have more complex technical requirements. 而我国幅员辽阔,铁路线路铺设区域和运营情况不尽相同,对于在桥上铺设无缝线路有着更加复杂的技术要求。